5.0MWp
OperatingAmdjarass
Ennedi-Est, Chad · Operating
Hybrid solar-storage plant powering the town, built in 11 months.
NOY Energy develops, builds and operates solar and storage plants for industry, towns and public institutions. We invest our own capital, so our partners pay less for power without paying for the plant.
Up to US$ 50 million planned for Pakistan’s first phase: about 50 MWp of solar with battery storage.
5.0MWp
OperatingEnnedi-Est, Chad · Operating
Hybrid solar-storage plant powering the town, built in 11 months.
2.8MWp
OperatingOuaddaï, Chad · Operating
Solar power plant for the town.
2.5MWp
OperatingSila, Chad · Operating
Solar power plant for the town.
0.12MWp
OperatingMayo-Kebbi Est, Chad · Operating
Distributed solar for local services.
2.5MWp
Under constructionEastern Chad · 12 MWh storage · Under construction
Solar generation paired with 12 MWh of battery storage.
275km
World Bank-fundedChad · HV line and street lights · World Bank-funded
20,000 solar street lights and an HV line, delivered in consortium.
Everything a solar project needs, under one roof: design, financing, construction and long-term operation.
Open it up and the work comes out in order: site surveys, system design, procurement and the crews who install it.
Panels leave for the field. 10.4 MWp of solar is already commissioned, with 12 MWh of storage on the way.
Six of the 40+ projects we have delivered, in 15+ localities. Pakistan is next.
We bring the same end-to-end approach to industrial zones, project sites and public institutions across Pakistan.
Grid-connected or captive utility-scale plants with battery storage.
Lower, predictable energy costs for industrial zones, with zero-capex options.
Reliable power for remote project sites, camps and communities.
Solar street lighting and transmission line delivery, the same work we carried out on a World Bank-funded project in Chad.
We handle each project end to end, from design and financing to construction and long-term operation, often in remote and off-grid locations.
01 / 04
10.4MWp
Solar capacity commissioned
Four operating plants in Chad: Amdjarass, Adré, Goz-Beïda and Guéliendeng.
Choose the model that suits your balance sheet. Each covers the whole job, from the first survey to long-term operation.
The client owns the plant from day one.
Zero capex. The client pays only for the solar units it uses.
We build, own and operate the plant, then transfer it.
One partner carries each project through four stages, so nothing is lost between the design, the build and the years of operation after it.
Site survey, load and bill analysis. We measure what a site uses and what it pays today, so the plant is sized to the real load.
System design and funding structure. We design the plant and set out how it is paid for, including options with no upfront capital.
Turnkey EPC delivery and commissioning. One contractor from procurement to switch-on. Amdjarass went from construction start to commissioning in 11 months.
Monitoring, O&M and performance. We monitor and maintain the plant for the long term, so it keeps producing what it was designed to.
We put our own capital into solar and storage where power is expensive or unreliable. We finance, build and operate the plants ourselves, so our partners get lower tariffs without the upfront cost.
Figures shown in
Invested to date (approx.)
US$ 22 million
≈ PKR 6.0 billion
Next: Pakistan, indicative first phase
up to US$ 50 million
≈ PKR 13.9 billion over 3 years
Investment to date is estimated from project capacities at typical installed costs. US$ 1 = PKR 277.
Indicative CO₂ savings from our plants, and the checks we run on every site.
Tonnes, indicative
Move the slider to see what a plant in Pakistan could produce in a year.
Uses the same assumptions as our Pakistan estimate: 1,550 kWh per kWp a year and a grid factor of 0.45 t CO₂ per MWh.
Indicative estimates, not measured data. Chad: 10.4 MWp × 1,750 kWh/kWp a year, displacing diesel generation at 0.75 t CO₂/MWh. Pakistan: 50 MWp × 1,550 kWh/kWp a year at an assumed grid factor of 0.45 t CO₂/MWh. The 25-year total allows for 0.5% annual module degradation.
Three pieces of work that show how we deliver: a full plant in under a year, a funded consortium programme, and towns that run on our power.
Featured project · CommissionedAmdjarass
Ennedi-Est, Chad
A 5.0 MWp hybrid solar-storage plant that powers the town of Amdjarass, built end to end by NOY Energy in 11 months.
Lighting and grid
Chad
20,000 solar street lights and 275 km of high-voltage line, delivered as part of a consortium on a World Bank-funded project.
Power for townsTowns across Chad
15+ localities
Solar and storage plants powering more than fifteen localities, from 0.12 MWp of distributed solar to a 5.0 MWp hybrid plant.
Pakistan’s first phase alone could turn it into about 77,500 MWh a year.
We would welcome an introductory meeting with industrial zones, manufacturers and public institutions.